  PRODUCTION

GIO-PE considers all possible well architectures that could be used, given specific reservoir and geomechanical parameters. GIO-PE can work together with the client operators D&C department to develop a suitable philosophy and design, that can provide significant improvements in drilling pattern, well orientation, development well spacing and optimal completion design.

From simple vertical perforated wells, to complex multi-lateral multi-fracture horizontal wellbores, understanding the reservoir and wellbore interaction is crucial to providing specific drainage shapes and optimized field production and application of enhanced recovery (EOR/IOR) techniques.

 
 

  WELL

GIO-PE is able to recommend optimized well stimulation treatments for productivity enhancement, as we have competency in both production chemicals and engineering. GIO-PE understands that different reservoirs require different techniques to enhance productivity and our personnel specialize in designing solutions that are optimized for each reservoir.

GIO-PE works world-wide with all major service providers, to ensure proper implementation of production enhancement techniques that provide optimized inflow performance from the reservoir to the wellbore. It is only from effective project management that potentially large-scale savings that are compounded over the remaining life of the well.

 
 

  RESERVOIR

Matching appropriate drilling, stimulation and drainage patterns to an optimized reservoir management strategy can significantly increase ultimate recovery, reserves and cashflow. It is important that when looking to optimize well performance that operators consider a number of candidates and ultimately, start to look at an optimised field and reservoir management strategy as the optimum way to maximize, sustainable field performance.

eFrac Logo eFrac Logo
  • Innovation
  • Evolution
  • ReSolution
  • Knowledge
  • Information
  • Blog
  • Contact

information 4

SPE18144-MS “Permanent Downhole Gauges Selection for HPHT and Fractured Basement Reservoirs”, Vietnam H.V. Pham, Cuulong JOC; C.A. Green, G Frac; C Yapp, Weatherford; T.M. Le and A. Butt, Cuulong JOC. 

This paper describes a methodology used by an Operator to address the significant challenges of selecting gauges for high temperature reservoir monitoring. The work details how the extensive qualification/testing process was successfully applied to select suitable gauges. Four major areas were addressed using this methodology, which are necessary in order to ensure success. Application of the methodology has led to a 100% success rate for recently installed gauges and application of this system.


CONTACT NUMBERS

UK  +44 7799 382 371

US  +1 720 236 3227

EMAIL

info@efrac.net

© e-Frac® 2022   |  All Rights ReservedWebsite made by helloweb